Edgewood III substation interconnection queue

1 active project totalling 1.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-250 Kumquat Solar 12 1.1 Solar In Service
AH2-071 Edgewood 12.47 kV III 12.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.