Rhodes Lane substation interconnection queue
1 active project totalling 28 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
28active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Y2-080 | Rhodes Lane 500kV | 500 | 1,065 | Gas | Withdrawn |
| C01-1267 | Rhodes Lane 500 kV | 500 | 28 | Gas | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.