Heritage substation interconnection queue
3 active projects totaling 109 MW in the PJM queue, plus 2 with terminal status (shown grayed).
5 PJM queue filings name Heritage as the point of interconnection, all in Brunswick County, VA.
Target commercial operation dates as filed run from Apr 2025 to Jul 2031 (5 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-635 | Heritage 500 kV | 500 | 162 | Solar | Withdrawn | Apr 2025 |
| AG2-636 | Heritage 500 kV | 500 | 108 | Battery | Withdrawn | Apr 2025 |
| AH1-221 | Heritage 500 kV | 500 | 45 | Battery | Active | Jun 2031 |
| AH1-678 | Heritage 500 kV | 500 | 34 | Gas | Active | Sep 2025 |
| AG1-153 | Brunswick Battery Storage | 500 | 30 | Battery | UC | Jul 2031 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Heritage (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Brunswick County, VA
- Carson-Wake: 1 active, 1,376 MW of 3 filed
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Unity - Rawlings: 1 active, 200 MW of 2 filed
- Rawlings - Unity: 1 active, 180 MW of 3 filed
- Brunswick: 4 active, 153.8 MW of 6 filed
- Shackleford: 2 active, 12.2 MW of 3 filed
- Lawrenceville: 1 active, 11 MW of 3 filed
- Rawlings-Clover: none active of 6 filed
- Danieltown DP–Brunswick: none active of 2 filed