Rawlings-Clover substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-291 | Rawlings-Clover 500kV | 500 | 150 | Battery | Withdrawn |
| AG1-505 | Rawlings-Clover 500 kV | 500 | 90 | Solar | Withdrawn |
| AG1-506 | Rawlings-Clover 500 kV | 500 | 90 | Solar | Withdrawn |
| AG2-580 | Rawlings-Clover 500 kV | 500 | 90 | Solar | Withdrawn |
| AG2-128 | Rawlings-Clover 500 kV | 500 | 40 | Battery | Withdrawn |
| AG2-129 | Rawlings-Clover 500 kV | 500 | 40 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.