Rawlings-Clover substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AH2-291 Rawlings-Clover 500kV 500 150 Battery Withdrawn
AG1-505 Rawlings-Clover 500 kV 500 90 Solar Withdrawn
AG1-506 Rawlings-Clover 500 kV 500 90 Solar Withdrawn
AG2-580 Rawlings-Clover 500 kV 500 90 Solar Withdrawn
AG2-128 Rawlings-Clover 500 kV 500 40 Battery Withdrawn
AG2-129 Rawlings-Clover 500 kV 500 40 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.