Rawlings-Clover substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 6 with terminal status (shown grayed).
6 PJM queue filings name Rawlings-Clover as the point of interconnection, all in Brunswick County, VA.
Target commercial operation dates as filed run from Jul 2024 to Jun 2026 (6 filings).
Transmission owner as filed: Dominion (3 filings).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-291 | Rawlings-Clover 500kV | 500 | 150 | Battery | Withdrawn | Jun 2026 |
| AG1-505 | Rawlings-Clover 500 kV | 500 | 90 | Solar | Withdrawn | Jul 2024 |
| AG1-506 | Rawlings-Clover 500 kV | 500 | 90 | Solar | Withdrawn | Jul 2024 |
| AG2-580 | Rawlings-Clover 500 kV | 500 | 90 | Solar | Withdrawn | Oct 2024 |
| AG2-128 | Rawlings-Clover 500 kV | 500 | 40 | Battery | Withdrawn | Jul 2024 |
| AG2-129 | Rawlings-Clover 500 kV | 500 | 40 | Battery | Withdrawn | Jul 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Brunswick County, VA
- Carson-Wake: 1 active, 1,376 MW of 3 filed
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Unity - Rawlings: 1 active, 200 MW of 2 filed
- Rawlings - Unity: 1 active, 180 MW of 3 filed
- Brunswick: 4 active, 153.8 MW of 6 filed
- Heritage: 3 active, 109 MW of 5 filed
- Shackleford: 2 active, 12.2 MW of 3 filed
- Lawrenceville: 1 active, 11 MW of 3 filed
- Danieltown DP–Brunswick: none active of 2 filed