Substation Scout

Heritage - Wake 500 kV

PJM queue ID AG2-069

Heritage - Wake 500 kV (AG2-069) is listed in the PJM interconnection queue as a 90 MW solar project in Brunswick County, VA. The filing names Heritage - Wake as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2029.

Queue IDAG2-069
Project nameHeritage - Wake 500 kV
Status (as published)Active
SubstationHeritage - Wake
Point of interconnectionHeritage - Wake 500 kV
CountyBrunswick
StateVA
Voltage500 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-12-31
Source datasetcycle

Same substation and county

Heritage - Wake substation: 7 requests in the PJM queue, 5 active totaling 341.6 MW.

Queue IDProjectMWResourceStatus
AG2-570Heritage - Wake 500 kV100SolarActive
AG2-068Heritage - Wake 500 kV60SolarActive
AG2-369Heritage - Wake 500 kV51.6SolarActive
AG2-571Heritage - Wake 500 kV40BatteryActive
C01-1731Heritage - Wake 500 kV90SolarWithdrawn
AG2-067Heritage - Wake 500 kV30SolarWithdrawn

Brunswick, VA: 45 requests in the PJM queue, 18 active totaling 2,685.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Transmission ownerDominion
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy150.0
MW capacity90.0
MFO250.0
Submitted date12/30/2020
Last updated7/7/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first