Cox-Whitakers substation interconnection queue

1 active project totalling 55.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
55.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC1-208 Halifax County Solar 115 55.4 Solar Under Construction
AI2-295 Cox-Whitakers 115kV 115 20.6 Solar Withdrawn
AG1-159 Cox-Whitakers 115 kV 115 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.