Carson-Wake substation interconnection queue
1 active project totaling 1,376 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2015 to Feb 2023 (3 filings).
1active projects
1,376active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X2-076 | Brunswick Combined Cycle Power Station | 500 | 1,376 | Gas | In Service | May 2016 |
| AA1-064 | Carson-Wake 500kV | 500 | 56 | Solar | Withdrawn | Dec 2015 |
| AI2-280 | Carson-Wake 500kV | 500 | 34 | Gas | Withdrawn | Feb 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Brunswick County, VA
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Unity - Rawlings: 1 active, 200 MW of 2 filed
- Rawlings - Unity: 1 active, 180 MW of 3 filed
- Brunswick: 4 active, 153.8 MW of 6 filed
- Heritage: 3 active, 109 MW of 5 filed
- Shackleford: 2 active, 12.2 MW of 3 filed
- Lawrenceville: 1 active, 11 MW of 3 filed
- Rawlings-Clover: none active of 6 filed
- Danieltown DP–Brunswick: none active of 2 filed
Other PJM queue substations in Northhampton County, NC
- Thelma: 2 active, 207.7 MW of 4 filed
- Clubhouse-Lakeview: 1 active, 67 MW of 3 filed
- Carolina-Jackson: 2 active, 54.8 MW of 2 filed
- Carolina- Earleys: none active of 2 filed
- Earleys-Northampton: none active of 2 filed