Substation Scout

Carson-Wake substation interconnection queue

1 active project totaling 1,376 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2015 to Feb 2023 (3 filings).

1active projects
1,376active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
X2-076 Brunswick Combined Cycle Power Station 500 1,376 Gas In Service May 2016
AA1-064 Carson-Wake 500kV 500 56 Solar Withdrawn Dec 2015
AI2-280 Carson-Wake 500kV 500 34 Gas Withdrawn Feb 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Brunswick County, VA

All 45 PJM queue filings in Brunswick County, VA.

Other PJM queue substations in Northhampton County, NC

All 18 PJM queue filings in Northhampton County, NC.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first