Rawlings - Unity substation interconnection queue
1 active project totaling 180 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Rawlings - Unity as the point of interconnection, all in Brunswick County, VA.
Target commercial operation dates as filed run from Dec 2028 to Dec 2032 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-528 | Honeybee Solar, LLC | 500 | 180 | Solar | Active | Dec 2028 |
| AG2-581 | Rawlings - Unity 500 kV | 500 | 90 | Solar | Withdrawn | Dec 2030 |
| C01-1298 | Rawlings - Unity 500 kV | 500 | 0 | Solar | Withdrawn | Dec 2032 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-581 | Terminal status | 90 | Active → Withdrawn |
Other PJM queue substations in Brunswick County, VA
- Carson-Wake: 1 active, 1,376 MW of 3 filed
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Unity - Rawlings: 1 active, 200 MW of 2 filed
- Brunswick: 4 active, 153.8 MW of 6 filed
- Heritage: 3 active, 109 MW of 5 filed
- Shackleford: 2 active, 12.2 MW of 3 filed
- Lawrenceville: 1 active, 11 MW of 3 filed
- Rawlings-Clover: none active of 6 filed
- Danieltown DP–Brunswick: none active of 2 filed