Dawson-South Justice substation interconnection queue

3 active projects totalling 90.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
90.4active MW
5total filed
Queue IDProjectkVMWResourceStatus
AI2-301 Dawson-South Justice 115kV 115 45.1 Solar Withdrawn
AC2-084 American Beech Solar 115 40.2 Solar In Service
AC1-098 American Beech Solar 115 37.6 Solar In Service
AC2-083 Dawson-South Justice 115kV 115 13.4 Solar Withdrawn
AC1-099 American Beech Solar 115 12.6 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.