Dawson-South Justice substation interconnection queue
3 active projects totalling 90.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
90.4active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-301 | Dawson-South Justice 115kV | 115 | 45.1 | Solar | Withdrawn |
| AC2-084 | American Beech Solar | 115 | 40.2 | Solar | In Service |
| AC1-098 | American Beech Solar | 115 | 37.6 | Solar | In Service |
| AC2-083 | Dawson-South Justice 115kV | 115 | 13.4 | Solar | Withdrawn |
| AC1-099 | American Beech Solar | 115 | 12.6 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.