Unity - Rawlings substation interconnection queue
1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Unity - Rawlings as the point of interconnection, all in Brunswick County, VA.
Target commercial operation date as filed: Jun 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
1active projects
200active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2197 | Unity - Rawlings 500 kV | 500 | 200 | Battery | Active | Jun 2030 |
| C01-2198 | Unity - Rawlings 500 kV | 500 | 200 | Battery | Withdrawn | Jun 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Brunswick County, VA
- Carson-Wake: 1 active, 1,376 MW of 3 filed
- Heritage - Wake: 5 active, 341.6 MW of 7 filed
- Rawlings - Unity: 1 active, 180 MW of 3 filed
- Brunswick: 4 active, 153.8 MW of 6 filed
- Heritage: 3 active, 109 MW of 5 filed
- Shackleford: 2 active, 12.2 MW of 3 filed
- Lawrenceville: 1 active, 11 MW of 3 filed
- Rawlings-Clover: none active of 6 filed
- Danieltown DP–Brunswick: none active of 2 filed