Halifax, NC interconnection queue
8 active projects totalling 355.8 MW in the PJM queue, plus 14 with terminal status (shown greyed).
8active projects
355.8active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2145 | South Justice - Dawsons Crossroads DP 115 kV | 115 | 100 | Hybrid | Active |
| C01-1731 | Heritage - Wake 500 kV | 500 | 90 | Solar | Withdrawn |
| AI1-113 | New Halifax - Dawson 115 kV | 115 | 74.9 | Hybrid | Withdrawn |
| AD1-029 | Scotland Neck-South Justice 115 kV | 115 | 66.3 | Hybrid | Withdrawn |
| AC1-208 | Halifax County Solar | 115 | 55.4 | Solar | Under Construction |
| C01-1464 | Bynums Bridge 115 kV | 115 | 49.6 | Battery | Active |
| AI2-301 | Dawson-South Justice 115kV | 115 | 45.1 | Solar | Withdrawn |
| AA2-057 | Chestnut Solar | 115 | 44.7 | Solar | In Service |
| AC2-084 | American Beech Solar | 115 | 40.2 | Solar | In Service |
| AD1-056 | Sweetleaf Solar | 230 | 38.9 | Solar | Engineering and Procurement |
| AF2-219 | Not reported | n/r | 38.7 | Solar | Withdrawn |
| AD1-057 | Sweetleaf Solar | 230 | 21.7 | Solar | Engineering and Procurement |
| AI2-295 | Cox-Whitakers 115kV | 115 | 20.6 | Solar | Withdrawn |
| AA2-055 | Hornertown 34.5kV | 34.5 | 14 | Solar | Withdrawn |
| AA2-056 | Hornertown 34.5kV | 34.5 | 14 | Solar | Withdrawn |
| AA2-068 | N301 Solar | 115 | 13.7 | Solar | Withdrawn |
| AA2-105 | Hornertown 34.5kV | 34.5 | 13.6 | Solar | Withdrawn |
| AC2-083 | Dawson-South Justice 115kV | 115 | 13.4 | Solar | Withdrawn |
| AA2-113 | Hornertown 34.5kV | 34.5 | 10.9 | Solar | Withdrawn |
| AB1-053 | Hornertown 34.5kV | 34.5 | 6.4 | Solar | Withdrawn |
| AA2-165 | Chestnut Solar | 115 | 5.3 | Solar | In Service |
| AG1-159 | Cox-Whitakers 115 kV | 115 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.