Hornertown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AA2-055 Hornertown 34.5kV 34.5 14 Solar Withdrawn
AA2-056 Hornertown 34.5kV 34.5 14 Solar Withdrawn
AA2-105 Hornertown 34.5kV 34.5 13.6 Solar Withdrawn
AA2-113 Hornertown 34.5kV 34.5 10.9 Solar Withdrawn
AB1-053 Hornertown 34.5kV 34.5 6.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.