Cassius Blue Solar
PJM queue ID AE2-094
Cassius Blue Solar (AE2-094) is listed in the PJM interconnection queue as a 207.2 MW hybrid project in Sussex County, VA. The filing names Carson-Rogers Road as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of August 1, 2031.
| Queue ID | AE2-094 |
|---|---|
| Project name | Cassius Blue Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Carson-Rogers Road |
| Point of interconnection | Carson-Rogers Road 500 kV |
| County | Sussex |
| State | VA |
| Voltage | 500 kV |
| Capacity | 207.2 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2031-08-01 |
| Source dataset | serial |
Same substation and county
Carson-Rogers Road substation: 2 requests in the PJM queue, 1 active totaling 207.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE1-069 | Carson-Rogers Road 500 kV | 254.5 | Solar | Withdrawn |
Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 300 |
| MW capacity | 207.2 |
| MFO | 300 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.