Kinsley 2 Beaverbrook Solar (AE2-064) is listed in the PJM interconnection queue as a 0.9 MW solar project in Gloucester County, NJ. The filing names Beaverbrook as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 31, 2020.

Queue IDAE2-064
Project nameKinsley 2 Beaverbrook Solar
Status (as published)In Service
SubstationBeaverbrook
Point of interconnectionBeaverbrook 13 kV
CountyGloucester
StateNJ
Voltage13 kV
Capacity0.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2020-08-31
Source datasetserial

Same substation and county

Beaverbrook substation: 3 requests in the PJM queue, 2 active totaling 2.3 MW.

Queue IDProjectMWResourceStatus
Y3-087Beaverbrook (Kinsley Solar)1.4SolarIn Service
AA1-019Gloucester Solar Farm2.7SolarWithdrawn

Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy2
MW capacity0.85
MFO5.8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.