Beaverbrook (Kinsley Solar) (Y3-087) is listed in the PJM interconnection queue as a 1.4 MW solar project in Gloucester County, NJ. The filing names Beaverbrook as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2015.

Queue IDY3-087
Project nameBeaverbrook (Kinsley Solar)
Status (as published)In Service
SubstationBeaverbrook
Point of interconnectionBeaverbrook 13kV
CountyGloucester
StateNJ
Voltage13 kV
Capacity1.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2015-06-30
Source datasetserial

Same substation and county

Beaverbrook substation: 3 requests in the PJM queue, 2 active totaling 2.3 MW.

Queue IDProjectMWResourceStatus
AE2-064Kinsley 2 Beaverbrook Solar0.9SolarIn Service
AA1-019Gloucester Solar Farm2.7SolarWithdrawn

Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy3.8
MW capacity1.44
MFO3.8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.