Owens Corning Solar
PJM queue ID X3-075
Owens Corning Solar (X3-075) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Camden County, NJ. The filing names Runnemede as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 16, 2017.
| Queue ID | X3-075 |
|---|---|
| Project name | Owens Corning Solar |
| Status (as published) | In Service |
| Substation | Runnemede |
| Point of interconnection | Runnemede 13kV |
| County | Camden |
| State | NJ |
| Voltage | 13 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2017-02-16 |
| Source dataset | serial |
Same substation and county
Runnemede substation: 2 requests in the PJM queue, 2 active totaling 1.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-264 | Owens Corning Solar | 1.3 | Solar | In Service |
Camden, NJ: 46 requests in the PJM queue, 10 active totaling 310.1 MW.
A substation with the same name is named in PJM transmission planning materials: Runnemede Station (PSEG, 2 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 3 |
| MW capacity | 0 |
| MFO | 3 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.