Milan substation interconnection queue

2 active projects totalling 21 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
21active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH1-301 Milan 138 kV 138 100 Battery Withdrawn
Z1-092 Milan Energy 34 19.9 Gas In Service
AH2-319 Milan 34.5 kV 34.5 4.5 Solar Withdrawn
AD1-142 Milan Energy 34.5 1.1 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.