Substation Scout

Milan Energy

PJM queue ID Z1-092

Milan Energy (Z1-092) is listed in the PJM interconnection queue as a 19.9 MW gas project in Lackawanna County, PA. The filing names Milan as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 2, 2017.

Queue IDZ1-092
Project nameMilan Energy
Status (as published)In Service
SubstationMilan
Point of interconnectionMilan 34kV
CountyLackawanna
StatePA
Voltage34 kV
Capacity19.9 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2017-02-02
Source datasetserial

Same substation and county

Milan substation: 4 requests in the PJM queue, 2 active totaling 21 MW.

Queue IDProjectMWResourceStatus
AD1-142Milan Energy1.1GasIn Service
AH1-301Milan 138 kV100BatteryWithdrawn
AH2-319Milan 34.5 kV4.5SolarWithdrawn

Lackawanna, PA: 25 requests in the PJM queue, 10 active totaling 3,660.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19.9
MW capacity19.9
MFO19.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.