Greenfield substation interconnection queue

1 active project totalling 31.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
31.6active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-040 Fayette Solar 69 31.6 Solar In Service
AI2-250 Greenfield 69 kV 69 10 Solar Withdrawn
AF2-283 LK-Route 106 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.