Allen, IN interconnection queue

6 active projects totalling 1,133.1 MW in the PJM queue, plus 16 with terminal status (shown greyed).

6active projects
1,133.1active MW
22total filed
Queue IDProjectkVMWResourceStatus
C01-2021 Allen - R.P. Mone 345 kV 345 931.1 Gas Active
AH1-549 Allen - RP Mone 345 kV 345 108 Solar Withdrawn
AH1-299 Coventry 138 kV 138 100 Battery Withdrawn
AH1-301 Milan 138 kV 138 100 Battery Withdrawn
AH1-413 Wayne Trace 138 kV 138 100 Battery Withdrawn
AG1-365 Flatrock Creek Solar II 345 60 Solar Engineering and Procurement
AG1-368 Tillman Solar Park 138 60 Solar Engineering and Procurement
AG1-424 Sowers 138 kV 138 60 Solar Withdrawn
AG2-400 Allen 345 kV 345 60 Solar Withdrawn
AG2-574 Sowers 138 kV 138 60 Solar Withdrawn
AH1-300 Hacienda 138 kV 138 50 Battery Withdrawn
S72 Dog Creek Wind Farm 345 48 Wind Withdrawn
AI2-426 Allen - RP Mone 345 kV 345 43.2 Solar Withdrawn
AF2-224 Flatrock Creek Solar I 345 42 Solar Engineering and Procurement
S73 Lincoln-North Delphos n/r 40 Wind Withdrawn
AI2-116 Allen 345kV 345 24 Solar Withdrawn
AI2-418 Sowers 138 kV 138 24 Solar Withdrawn
AG1-366 Flatrock Creek Storage I 345 20 Battery Engineering and Procurement
AG2-370 Tillman 138 kV 138 20 Battery Active
AG2-402 Allen 345 kV 345 20 Battery Withdrawn
Q54 Haviland-Tillman 138kV 138 20 Wind Withdrawn
AG2-408 Allen 345 kV 345 18 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.