Peckville substation interconnection queue
1 active project totaling 1 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Peckville as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Jun 2000 to Jan 2007 (2 filings).
1active projects
1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| O55 | Peckville 69kV | 69 | 9 | Gas | Withdrawn | Jan 2007 |
| D04 | Archbald | 69 | 1 | Gas | In Service | Jun 2000 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Lackawanna County, PA
- Lackawanna - Hopatcong: 3 active, 3,454.2 MW of 3 filed
- Lackawanna: 4 active, 1,436 MW of 7 filed
- Greenfield: 1 active, 31.6 MW of 3 filed
- Milan: 2 active, 21 MW of 4 filed
- Peckville-Jackson: none active of 4 filed
Other PJM queue substations in Wayne County, PA
- Lackawanna - Hopatcong: 3 active, 3,454.2 MW of 3 filed
- East Carbondale: 2 active, 83 MW of 2 filed
- Thompson: none active of 7 filed
- East Carbondale-Lackawanna: none active of 4 filed
- Peckville-Jackson: none active of 4 filed
- Hamlin: none active of 2 filed
- Lakeville: none active of 2 filed