Tillman substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Tillman as the point of interconnection, all in Allen County, IN.

Target commercial operation dates as filed run from May 2029 to Dec 2029 (2 filings).

Transmission owner as filed: AEP (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-368 Tillman Solar Park 138 60 Solar Withdrawn Dec 2029
AG2-370 Tillman 138 kV 138 20 Battery Withdrawn May 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AG2-370Terminal status20 Active → Withdrawn
2026-09-07AG1-368Terminal status60 Engineering and Procurement → Withdrawn

Other PJM queue substations in Allen County, IN

All 22 PJM queue filings in Allen County, IN.