Tennessee Gas-East Towanda substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Tennessee Gas-East Towanda as the point of interconnection, all in Bradford County, PA.
Target commercial operation date as filed: Dec 2027 (2 filings).
Transmission owner as filed: PENELEC (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-206 | Tennessee Gas-East Towanda 115 kV | 115 | 28.8 | Solar | Withdrawn | Dec 2027 |
| AG2-327 | Tennessee Gas-East Towanda 115 kV | 115 | 6 | Solar | Withdrawn | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Bradford County, PA
- E. Towanda: 2 active, 765 MW of 2 filed
- Mehoopany: 2 active, 64.5 MW of 3 filed
- Ontelaunee: 2 active, 33.6 MW of 5 filed
- Grover: 2 active, 21.4 MW of 2 filed
- Milan: 2 active, 21 MW of 4 filed
- Canton: 2 active, 21 MW of 2 filed
- Mansfield-S. Troy: 2 active, 20 MW of 2 filed
- Bradford: 1 active, 1.5 MW of 2 filed
- East Towanda: none active of 5 filed
- East Towanda-Grover: none active of 3 filed
- East Sayre: none active of 2 filed
- North Orwell: none active of 2 filed
- Towanda: none active of 2 filed