East Sayre substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-106 | Ellistown Solar & BESS | 34.5 | 20 | Hybrid | Withdrawn |
| AA2-167 | East Sayre 34.5kV | 34.5 | 19.9 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.