Mansfield-S. Troy substation interconnection queue
2 active projects totaling 20 MW in the PJM queue.
2 PJM queue filings name Mansfield-S. Troy as the point of interconnection, all in Bradford County, PA.
Target commercial operation dates as filed run from Dec 2009 to Aug 2010 (2 filings).
2active projects
20active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| P47 | Armenia Mountain WF | 115 | 20 | Wind | In Service | Dec 2009 |
| V2-019 | AES Armenia Mountain Wind, LLC | 115 | 0 | Wind | In Service | Aug 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Bradford County, PA
- E. Towanda: 2 active, 765 MW of 2 filed
- Mehoopany: 2 active, 64.5 MW of 3 filed
- Ontelaunee: 2 active, 33.6 MW of 5 filed
- Grover: 2 active, 21.4 MW of 2 filed
- Milan: 2 active, 21 MW of 4 filed
- Canton: 2 active, 21 MW of 2 filed
- Bradford: 1 active, 1.5 MW of 2 filed
- East Towanda: none active of 5 filed
- East Towanda-Grover: none active of 3 filed
- East Sayre: none active of 2 filed
- North Orwell: none active of 2 filed
- Tennessee Gas-East Towanda: none active of 2 filed
- Towanda: none active of 2 filed