Allen - RP Mone substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Allen - RP Mone as the point of interconnection, all in Allen County, IN.
Target commercial operation dates as filed run from Dec 2025 to Dec 2027 (2 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-549 | Allen - RP Mone 345 kV | 345 | 108 | Solar | Withdrawn | Dec 2025 |
| AI2-426 | Allen - RP Mone 345 kV | 345 | 43.2 | Solar | Withdrawn | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Allen County, IN
- Convoy-East Lima: 1 active, 70 MW of 2 filed
- Milan: 2 active, 21 MW of 4 filed
- Allen: none active of 10 filed
- Sowers: none active of 3 filed
- Tillman: none active of 2 filed
Site Scanner