East Towanda substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A48 | East Towanda 230kV | 230 | 750 | Gas | Withdrawn |
| AH1-720 | East Towanda 230 kV | 230 | 60 | Gas | Withdrawn |
| AI2-022 | East Towanda 230 kV | 230 | 60 | Gas | Withdrawn |
| AF2-197 | East Towanda 115 kV | 115 | 40.3 | Battery | Withdrawn |
| AA2-135 | East Towanda 34.5kV | 34.5 | 19.9 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.