East Towanda substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2017 to Dec 2026 (4 filings).
Transmission owner as filed: PENELEC (1 filing).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| A48 | East Towanda 230kV | 230 | 750 | Gas | Withdrawn | n/r |
| AH1-720 | East Towanda 230 kV | 230 | 60 | Gas | Withdrawn | Dec 2026 |
| AI2-022 | East Towanda 230 kV | 230 | 60 | Gas | Withdrawn | May 2025 |
| AF2-197 | East Towanda 115 kV | 115 | 40.3 | Battery | Withdrawn | Oct 2022 |
| AA2-135 | East Towanda 34.5kV | 34.5 | 19.9 | Gas | Withdrawn | Jun 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Union County, NJ
Other PJM queue substations in Bradford County, PA
- E. Towanda: 2 active, 765 MW of 2 filed
- Mehoopany: 2 active, 64.5 MW of 3 filed
- Ontelaunee: 2 active, 33.6 MW of 5 filed
- Grover: 2 active, 21.4 MW of 2 filed
- Milan: 2 active, 21 MW of 4 filed
- Canton: 2 active, 21 MW of 2 filed
- Mansfield-S. Troy: 2 active, 20 MW of 2 filed
- Bradford: 1 active, 1.5 MW of 2 filed
- East Towanda-Grover: none active of 3 filed
- East Sayre: none active of 2 filed
- North Orwell: none active of 2 filed
- Tennessee Gas-East Towanda: none active of 2 filed
- Towanda: none active of 2 filed
Site Scanner