Lackawanna - Hopatcong substation interconnection queue
3 active projects totaling 3,454.2 MW in the PJM queue.
3 PJM queue filings name Lackawanna - Hopatcong as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Jun 2031 to Jan 2034 (3 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: PPL (3 filings).
3active projects
3,454.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1193 | Lackawanna - Hopatcong 500 kV | 500 | 1,430 | Gas | Active | Jan 2033 |
| C01-2229 | Lackawanna - Hopatcong 500 kV | 500 | 1,309.2 | Hybrid | Active | Jun 2031 |
| C01-1194 | Lackawanna - Hopatcong 500 kV | 500 | 715 | Gas | Active | Jan 2034 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Lackawanna County, PA
- Lackawanna: 4 active, 1,436 MW of 7 filed
- Greenfield: 1 active, 31.6 MW of 3 filed
- Milan: 2 active, 21 MW of 4 filed
- Peckville: 1 active, 1 MW of 2 filed
- Peckville-Jackson: none active of 4 filed
Other PJM queue substations in Wayne County, PA
- East Carbondale: 2 active, 83 MW of 2 filed
- Peckville: 1 active, 1 MW of 2 filed
- Thompson: none active of 7 filed
- East Carbondale-Lackawanna: none active of 4 filed
- Peckville-Jackson: none active of 4 filed
- Hamlin: none active of 2 filed
- Lakeville: none active of 2 filed