Bradford substation interconnection queue

1 active project totalling 1.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
U3-012 Bradford 115kV 115 11 Wind Withdrawn
T86 North Tier LF 34.5 1.5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.