Bradford substation interconnection queue

1 active project totaling 1.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Bradford as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jul 2008 to Oct 2011 (2 filings).

1active projects
1.5active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
U3-012 Bradford 115kV 115 11 Wind Withdrawn Oct 2011
T86 North Tier LF 34.5 1.5 Gas In Service Jul 2008

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Bradford (PECO, 8 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in McKean County, PA

All 21 PJM queue filings in McKean County, PA.

Other PJM queue substations in Bradford County, PA

All 52 PJM queue filings in Bradford County, PA.