Grover substation interconnection queue

2 active projects totalling 21.4 MW in the PJM queue.

2active projects
21.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z1-110 Beaver Dam Generating Station 34 19.9 Gas In Service
AD1-108 Beaver Dam Generating Station 34 1.5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.