Convoy-East Lima substation interconnection queue
1 active project totalling 70 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
70active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R60 | Blue Creek WF | 345 | 70 | Wind | In Service |
| S72 | Dog Creek Wind Farm | 345 | 48 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.