Substation Scout

Sowers substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-424 Sowers 138 kV 138 60 Solar Withdrawn
AG2-574 Sowers 138 kV 138 60 Solar Withdrawn
AI2-418 Sowers 138 kV 138 24 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.