Sowers substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Sowers as the point of interconnection, all in Allen County, IN.
Target commercial operation dates as filed run from Dec 2023 to Dec 2026 (3 filings).
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-424 | Sowers 138 kV | 138 | 60 | Solar | Withdrawn | Dec 2023 |
| AG2-574 | Sowers 138 kV | 138 | 60 | Solar | Withdrawn | Dec 2023 |
| AI2-418 | Sowers 138 kV | 138 | 24 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Sowers (AEP, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Allen County, IN
- Convoy-East Lima: 1 active, 70 MW of 2 filed
- Milan: 2 active, 21 MW of 4 filed
- Allen: none active of 10 filed
- Allen - RP Mone: none active of 2 filed
- Tillman: none active of 2 filed