Peckville-Jackson substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Peckville-Jackson as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Nov 2013 to Dec 2017 (3 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Y1-067 | Peckville-Jackson 69kV | 69 | 8.4 | Wind | Withdrawn | Nov 2013 |
| AA2-069A | Peckville-Jackson 69kV | 69 | 8 | Wind | Withdrawn | n/r |
| Y3-041 | Peckville-Jackson 69kV | 69 | 8 | Wind | Withdrawn | Dec 2017 |
| Z1-098 | Valley View Flywheel Station | 69 | 0 | Battery | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wayne County, PA
- Lackawanna - Hopatcong: 3 active, 3,454.2 MW of 3 filed
- East Carbondale: 2 active, 83 MW of 2 filed
- Peckville: 1 active, 1 MW of 2 filed
- Thompson: none active of 7 filed
- East Carbondale-Lackawanna: none active of 4 filed
- Hamlin: none active of 2 filed
- Lakeville: none active of 2 filed
Other PJM queue substations in Lackawanna County, PA
- Lackawanna - Hopatcong: 3 active, 3,454.2 MW of 3 filed
- Lackawanna: 4 active, 1,436 MW of 7 filed
- Greenfield: 1 active, 31.6 MW of 3 filed
- Milan: 2 active, 21 MW of 4 filed
- Peckville: 1 active, 1 MW of 2 filed