Peckville-Jackson substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
Y1-067 Peckville-Jackson 69kV 69 8.4 Wind Withdrawn
AA2-069A Peckville-Jackson 69kV 69 8 Wind Withdrawn
Y3-041 Peckville-Jackson 69kV 69 8 Wind Withdrawn
Z1-098 Valley View Flywheel Station 69 0 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.