East Towanda-Grover substation interconnection queue
1 active project totalling 60.3 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
60.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-144 | Gateway Bradford Plant | 230 | 163 | Gas | Withdrawn |
| AE2-139 | Bradford Solar | 230 | 60.3 | Solar | Engineering and Procurement |
| U2-016 | East Towanda-Grover 230kV | 230 | 11.1 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.