East Towanda-Grover substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name East Towanda-Grover as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Oct 2011 to Dec 2027 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA1-144 Gateway Bradford Plant 230 163 Gas Withdrawn Nov 2021
AE2-139 Bradford Solar 230 60.3 Solar Pending Termination Dec 2027
U2-016 East Towanda-Grover 230kV 230 11.1 Wind Withdrawn Oct 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-26AE2-139Terminal status60.3 Engineering and Procurement → Pending Termination

Other PJM queue substations in Bradford County, PA

All 52 PJM queue filings in Bradford County, PA.

Other PJM queue substations in McKean County, PA

All 21 PJM queue filings in McKean County, PA.