Ontelaunee substation interconnection queue

2 active projects totaling 33.6 MW in the PJM queue, plus 3 with terminal status (shown grayed).

5 PJM queue filings name Ontelaunee as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Nov 2016 to Mar 2029 (5 filings).

2active projects
33.6active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA1-042 Ontelaunee n/r 52.5 Gas Withdrawn Nov 2016
AA1-043 Ontelaunee Power Generating Plant 230 19.6 Gas In Service Sep 2017
AD2-035 Ontelaunee Power Generating Plant 230 14 Gas In Service Dec 2019
AC1-183 Ontelaunee 230kV 230 12 Gas Withdrawn Jun 2019
AF2-030 Ontelaunee Power Generating Plant 230 8 Battery Withdrawn Mar 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Bradford County, PA

All 52 PJM queue filings in Bradford County, PA.

Other PJM queue substations in Berks County, PA

All 63 PJM queue filings in Berks County, PA.