Substation Scout

Lackawanna, PA interconnection queue

10 active projects totalling 3,660.4 MW in the PJM queue, plus 15 with terminal status (shown greyed).

10active projects
3,660.4active MW
25total filed
Queue IDProjectkVMWResourceStatus
C01-1193 Lackawanna - Hopatcong 500 kV 500 1,430 Gas Active
X4-048 Lackawanna Thermal Generating Station 230 1,000 Gas In Service
AE2-032 Pnode 1369011078-Pnode 51299 n/r 811 Not reported Withdrawn
C01-1194 Lackawanna - Hopatcong 500 kV 500 715 Gas Active
U2-075 Susquehanna-Roseland 500kV 500 636 Gas Withdrawn
B45 Lackawanna 230kV 230 555 Gas Withdrawn
AB1-108 Lackawanna 500 kV 500 485 Gas Withdrawn
Y2-089 Lackawanna Thermal Generating Station 230 370 Gas In Service
AH1-697 Lackawanna 230kV 230 78.6 Gas Withdrawn
AI1-101 Pocono-Acahela 230 kV 230 63.8 Solar Withdrawn
A31 Archbald 69 44 Gas In Service
AA1-077 Lackawanna Thermal Generating Station 230 34 Gas In Service
C01-1170 Lackawanna 230 kV 230 32 Gas Active
Z1-091 Hop Bottom Generating Station 34 19.9 Gas Withdrawn
Z1-092 Milan Energy 34 19.9 Gas In Service
AF2-006 Jermyn Tap-Brownell 69 kV 69 12 Solar Withdrawn
AF2-007 Tinker Tap–East Carbondale 69 kV 69 12 Solar Withdrawn
R53 Stanton-Brookside 69kV 69 12 Wind Withdrawn
T108 Archbald Generating Station 69 9.2 Gas In Service
O55 Peckville 69kV 69 9 Gas Withdrawn
M07 Archbald n/r 6.3 Gas In Service
AF2-282 LK-Justus 12.5 0 Hybrid Withdrawn
AF2-283 LK-Route 106 12.5 0 Hybrid Withdrawn
X2-034 Laplume n/r 0 Solar Withdrawn
Z1-098 Valley View Flywheel Station 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.