Lackawanna, PA interconnection queue
10 active projects totalling 3,660.4 MW in the PJM queue, plus 15 with terminal status (shown greyed).
10active projects
3,660.4active MW
25total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1193 | Lackawanna - Hopatcong 500 kV | 500 | 1,430 | Gas | Active |
| X4-048 | Lackawanna Thermal Generating Station | 230 | 1,000 | Gas | In Service |
| AE2-032 | Pnode 1369011078-Pnode 51299 | n/r | 811 | Not reported | Withdrawn |
| C01-1194 | Lackawanna - Hopatcong 500 kV | 500 | 715 | Gas | Active |
| U2-075 | Susquehanna-Roseland 500kV | 500 | 636 | Gas | Withdrawn |
| B45 | Lackawanna 230kV | 230 | 555 | Gas | Withdrawn |
| AB1-108 | Lackawanna 500 kV | 500 | 485 | Gas | Withdrawn |
| Y2-089 | Lackawanna Thermal Generating Station | 230 | 370 | Gas | In Service |
| AH1-697 | Lackawanna 230kV | 230 | 78.6 | Gas | Withdrawn |
| AI1-101 | Pocono-Acahela 230 kV | 230 | 63.8 | Solar | Withdrawn |
| A31 | Archbald | 69 | 44 | Gas | In Service |
| AA1-077 | Lackawanna Thermal Generating Station | 230 | 34 | Gas | In Service |
| C01-1170 | Lackawanna 230 kV | 230 | 32 | Gas | Active |
| Z1-091 | Hop Bottom Generating Station | 34 | 19.9 | Gas | Withdrawn |
| Z1-092 | Milan Energy | 34 | 19.9 | Gas | In Service |
| AF2-006 | Jermyn Tap-Brownell 69 kV | 69 | 12 | Solar | Withdrawn |
| AF2-007 | Tinker Tap–East Carbondale 69 kV | 69 | 12 | Solar | Withdrawn |
| R53 | Stanton-Brookside 69kV | 69 | 12 | Wind | Withdrawn |
| T108 | Archbald Generating Station | 69 | 9.2 | Gas | In Service |
| O55 | Peckville 69kV | 69 | 9 | Gas | Withdrawn |
| M07 | Archbald | n/r | 6.3 | Gas | In Service |
| AF2-282 | LK-Justus | 12.5 | 0 | Hybrid | Withdrawn |
| AF2-283 | LK-Route 106 | 12.5 | 0 | Hybrid | Withdrawn |
| X2-034 | Laplume | n/r | 0 | Solar | Withdrawn |
| Z1-098 | Valley View Flywheel Station | 69 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.