Loretto substation interconnection queue
1 active project totaling 50 MW in the PJM queue, plus 3 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2017 to Feb 2029 (4 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: DPL (1 filing).
1active projects
50active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-199 | Loretto 345 kV | 345 | 60 | Solar | Withdrawn | Dec 2025 |
| C01-1798 | Loretto 138 kV | 138 | 50 | Battery | Active | Dec 2028 |
| AI2-349 | Loretto 69 kV | 69 | 11 | Solar | Withdrawn | Feb 2029 |
| AB1-130 | Loretto 69kV | 69 | 3.8 | Solar | Withdrawn | Jun 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Livingston County, IL
- Pontiac - Dresden: 2 active, 438.6 MW of 2 filed
- McLean: 4 active, 264 MW of 5 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Powerton - Goodings Grove: 1 active, 80 MW of 2 filed
- Powerton-Goodings Grove: 2 active, 79.5 MW of 4 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Pontiac MidPoint-Brokaw: 1 active, 26 MW of 2 filed
- Pontiac Midpoint: none active of 4 filed
- Loretto-Wilton Center: none active of 3 filed
- Dresden-Pontiac Midpoint: none active of 2 filed
- Pontiac Midpoint-Dresden: none active of 2 filed
- Tazewell-Kendall: none active of 2 filed
Other PJM queue substations in Somerset County, MD
- Chestertown: 1 active, 19.8 MW of 3 filed
- Kings Creek: none active of 6 filed
- Crisfield: none active of 4 filed
- Costen: 2 active, 0 MW of 3 filed
- North Salisbury: none active of 3 filed
- Kings Creek-Crisfield: none active of 2 filed
Other PJM queue substations in Marion County, KY
- Marion County: 1 active, 64.2 MW of 3 filed
- Sulphur Creek-Loretto: none active of 2 filed
Site Scanner