Loretto substation interconnection queue

1 active project totalling 50 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
50active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH1-199 Loretto 345 kV 345 60 Solar Withdrawn
C01-1798 Loretto 138 kV 138 50 Battery Active
AI2-349 Loretto 69 kV 69 11 Solar Withdrawn
AB1-130 Loretto 69kV 69 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.