Loretto substation interconnection queue
1 active project totalling 50 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
50active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-199 | Loretto 345 kV | 345 | 60 | Solar | Withdrawn |
| C01-1798 | Loretto 138 kV | 138 | 50 | Battery | Active |
| AI2-349 | Loretto 69 kV | 69 | 11 | Solar | Withdrawn |
| AB1-130 | Loretto 69kV | 69 | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.