Loretto substation interconnection queue

1 active project totaling 50 MW in the PJM queue, plus 3 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jun 2017 to Feb 2029 (4 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: DPL (1 filing).

1active projects
50active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-199 Loretto 345 kV 345 60 Solar Withdrawn Dec 2025
C01-1798 Loretto 138 kV 138 50 Battery Active Dec 2028
AI2-349 Loretto 69 kV 69 11 Solar Withdrawn Feb 2029
AB1-130 Loretto 69kV 69 3.8 Solar Withdrawn Jun 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Livingston County, IL

All 47 PJM queue filings in Livingston County, IL.

Other PJM queue substations in Somerset County, MD

All 35 PJM queue filings in Somerset County, MD.

Other PJM queue substations in Marion County, KY

All 8 PJM queue filings in Marion County, KY.