Dresden-Pontiac Midpoint substation interconnection queue

1 active project totalling 60 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
60active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-321 Dresden-Pontiac Midpoint 345 kV 345 126.4 Solar Withdrawn
AG2-114 Dresden-Pontiac Midpoint 345 kV 345 60 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.