Dresden-Pontiac Midpoint substation interconnection queue
1 active project totalling 60 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
60active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-321 | Dresden-Pontiac Midpoint 345 kV | 345 | 126.4 | Solar | Withdrawn |
| AG2-114 | Dresden-Pontiac Midpoint 345 kV | 345 | 60 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.