Tazewell-Kendall substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Tazewell-Kendall as the point of interconnection, all in IL.
Target commercial operation date as filed: Dec 2012 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| R79 | Tazewell-Kendall 345kV | 345 | 60.1 | Wind | Withdrawn | Dec 2012 |
| W3-052 | Tazewell-Kendall 345kV | 345 | 26 | Wind | Withdrawn | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Livingston County, IL
- Pontiac - Dresden: 2 active, 438.6 MW of 2 filed
- McLean: 4 active, 264 MW of 5 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Powerton - Goodings Grove: 1 active, 80 MW of 2 filed
- Powerton-Goodings Grove: 2 active, 79.5 MW of 4 filed
- Loretto: 1 active, 50 MW of 4 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Pontiac MidPoint-Brokaw: 1 active, 26 MW of 2 filed
- Pontiac Midpoint: none active of 4 filed
- Loretto-Wilton Center: none active of 3 filed
- Dresden-Pontiac Midpoint: none active of 2 filed
- Pontiac Midpoint-Dresden: none active of 2 filed
Other PJM queue substations in Woodford County, IL
- Powerton-Nevada: 4 active, 172.4 MW of 4 filed
- Mole Creek: 1 active, 66 MW of 3 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Minonk: none active of 3 filed