Loretto 138 kV
PJM queue ID C01-1798
Loretto 138 kV (C01-1798) is listed in the PJM interconnection queue as a 50 MW battery project in Somerset County, MD. The filing names Loretto as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.
| Queue ID | C01-1798 |
|---|---|
| Project name | Loretto 138 kV |
| Status (as published) | Active |
| Substation | Loretto |
| Point of interconnection | Loretto 138 kV |
| County | Somerset |
| State | MD |
| Voltage | 138 kV |
| Capacity | 50 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Same substation and county
Loretto substation: 4 requests in the PJM queue, 1 active totaling 50 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-199 | Loretto 345 kV | 60 | Solar | Withdrawn |
| AI2-349 | Loretto 69 kV | 11 | Solar | Withdrawn |
| AB1-130 | Loretto 69kV | 3.8 | Solar | Withdrawn |
Somerset, MD: 35 requests in the PJM queue, 4 active totaling 96.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Trawler Energy LLC |
|---|---|
| Transmission owner | DPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 100.0 |
| MW capacity | 50.0 |
| MFO | 100.0 |
| Submitted date | 4/24/2026 |
| Last updated | 5/22/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.