Marion, KY interconnection queue

1 active project totalling 64.2 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
64.2active MW
8total filed
Queue IDProjectkVMWResourceStatus
AE1-143 Northern Bobwhite Solar 161 64.2 Solar Under Construction
AG1-488 Marion Co 161 kV 161 42 Solar Withdrawn
AG2-298 Sulphur Creek-Loretto 69 kV 69 23.3 Solar Withdrawn
AH1-532 Marion County - Marion Co. Industrial 161 kV 161 22.7 Solar Withdrawn
AI2-066 Marion County 161 kV 161 16.4 Solar Withdrawn
AH2-263 Marion Co - Marion Co industrial 161 kV 161 15.5 Solar Withdrawn
AG2-512 Sulphur Creek-Loretto 69 kV 69 11 Solar Withdrawn
AI2-349 Loretto 69 kV 69 11 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.