Marion, KY interconnection queue

2 active projects totalling 87.5 MW in the PJM queue, plus 6 with terminal status (shown greyed).

2active projects
87.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
AE1-143 Northern Bobwhite Solar 161 64.2 Solar Under Construction
AG1-488 Marion Co 161 kV 161 42 Solar Withdrawn
AG2-298 Sulphur Creek-Loretto 69 kV 69 23.3 Solar Active
AH1-532 Marion County - Marion Co. Industrial 161 kV 161 22.7 Solar Withdrawn
AI2-066 Marion County 161 kV 161 16.4 Solar Withdrawn
AH2-263 Marion Co - Marion Co industrial 161 kV 161 15.5 Solar Withdrawn
AG2-512 Sulphur Creek-Loretto 69 kV 69 11 Solar Withdrawn
AI2-349 Loretto 69 kV 69 11 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.