Powerton-Goodings Grove substation interconnection queue

2 active projects totalling 79.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
79.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
O22 Top Crop Generating Facility 345 60 Wind In Service
O27 Powerton-Goodings Grove 345kV 345 60 Gas Withdrawn
W2-046 Powerton-Goodings Grove 345kV 345 58.5 Wind Withdrawn
AA1-018 Otter Creek Wind Farm n/r 19.5 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.