Powerton-Goodings Grove substation interconnection queue
2 active projects totalling 79.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
79.5active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| O22 | Top Crop Generating Facility | 345 | 60 | Wind | In Service |
| O27 | Powerton-Goodings Grove 345kV | 345 | 60 | Gas | Withdrawn |
| W2-046 | Powerton-Goodings Grove 345kV | 345 | 58.5 | Wind | Withdrawn |
| AA1-018 | Otter Creek Wind Farm | n/r | 19.5 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.