Crisfield substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH2-049 Crisfield 69kV 69 20 Battery Withdrawn
AA1-059 Ibis 25 4.3 Solar Withdrawn
AE2-301 Crisfield 25 kV 25 2.2 Battery Withdrawn
Y2-108 Crisfield 25kV 25 2 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.