Crisfield substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-049 | Crisfield 69kV | 69 | 20 | Battery | Withdrawn |
| AA1-059 | Ibis | 25 | 4.3 | Solar | Withdrawn |
| AE2-301 | Crisfield 25 kV | 25 | 2.2 | Battery | Withdrawn |
| Y2-108 | Crisfield 25kV | 25 | 2 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.