McLean substation interconnection queue
4 active projects totalling 264 MW in the PJM queue, plus 1 with terminal status (shown greyed).
4active projects
264active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1164 | McLean 345 kV | 345 | 97.5 | Wind | Active |
| AE1-205 | Blooming Grove Solar Energy Center | 345 | 84 | Solar | Engineering and Procurement |
| AF2-225 | Bright Stalk Generating Facility | 345 | 63 | Solar | EP |
| AE2-173 | Blooming Grove Solar Energy Center | 345 | 50 | Battery | Withdrawn |
| AE2-223 | Bright Stalk Generating Facility | 345 | 19.5 | Wind | EP |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.