Pontiac Midpoint-Dresden substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-184 Pontiac Midpoint-Dresden n/r 82.7 Not reported Withdrawn
O24 Bright Stalk WF 345 60 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.