Pontiac Midpoint substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB1-086 | Pontiac Midpoint 345kV | 345 | 550 | Gas | Withdrawn |
| AH2-415 | Pontiac Midpoint 345 kV | 345 | 300 | Battery | Withdrawn |
| AG2-147 | Pontiac Midpoint 34.5kV | 34.5 | 12 | Solar | Withdrawn |
| AC2-152 | Pontiac Midpoint | n/r | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.