Pontiac Midpoint substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Pontiac Midpoint as the point of interconnection, all in IL.
Target commercial operation dates as filed run from May 2019 to Dec 2026 (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB1-086 | Pontiac Midpoint 345kV | 345 | 550 | Gas | Withdrawn | Jun 2019 |
| AH2-415 | Pontiac Midpoint 345 kV | 345 | 300 | Battery | Withdrawn | Dec 2026 |
| AG2-147 | Pontiac Midpoint 34.5kV | 34.5 | 12 | Solar | Withdrawn | Mar 2024 |
| AC2-152 | Pontiac Midpoint | n/r | 3.8 | Solar | Withdrawn | May 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Pontiac Midpoint (COMED, 1 mention).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in McLean County, IL
- McLean: 4 active, 264 MW of 5 filed
- Twin Grove: 2 active, 198.7 MW of 2 filed
- Blue Mound: 2 active, 40 MW of 3 filed
- Blue Mound I: 1 active, 39.6 MW of 2 filed
- Brokaw-Pontiac Midpoint: 1 active, 32.5 MW of 4 filed
- Blue Mound-Chestnut: none active of 6 filed
- McLean - Brokaw: 2 active, 0 MW of 3 filed
- Bluemond-Chestnut (CIR Increase): none active of 2 filed
- Brokaw to Mt Pulaski: none active of 2 filed
- Twin Groves: none active of 2 filed
Other PJM queue substations in Livingston County, IL
- Pontiac - Dresden: 2 active, 438.6 MW of 2 filed
- McLean: 4 active, 264 MW of 5 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Powerton - Goodings Grove: 1 active, 80 MW of 2 filed
- Powerton-Goodings Grove: 2 active, 79.5 MW of 4 filed
- Loretto: 1 active, 50 MW of 4 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Pontiac MidPoint-Brokaw: 1 active, 26 MW of 2 filed
- Loretto-Wilton Center: none active of 3 filed
- Dresden-Pontiac Midpoint: none active of 2 filed
- Pontiac Midpoint-Dresden: none active of 2 filed
- Tazewell-Kendall: none active of 2 filed