Pontiac Midpoint substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AB1-086 Pontiac Midpoint 345kV 345 550 Gas Withdrawn
AH2-415 Pontiac Midpoint 345 kV 345 300 Battery Withdrawn
AG2-147 Pontiac Midpoint 34.5kV 34.5 12 Solar Withdrawn
AC2-152 Pontiac Midpoint n/r 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.