Loretto-Wilton Center substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-252 | Loretto-Wilton Center | n/r | 90 | Solar | Withdrawn |
| AE1-172 | Livingston Wind | n/r | 44.9 | Wind | Withdrawn |
| AD2-137 | Loretto-Wilton Center | n/r | 26.4 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.