Loretto-Wilton Center substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-252 Loretto-Wilton Center n/r 90 Solar Withdrawn
AE1-172 Livingston Wind n/r 44.9 Wind Withdrawn
AD2-137 Loretto-Wilton Center n/r 26.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.