Kings Creek substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AH1-356 Kings Creek 138kV 138 30 Battery Withdrawn
R52A Buckeye Wind Farm - Phase 2 69 20 Wind Withdrawn
AC1-180 Kings Creek 25kV 25 6 Other Withdrawn
AC1-177 Kings Creek 25kV 25 4 Other Withdrawn
Y1-039 Kings Creek 69kV 69 0 Other Withdrawn
Y1-085 Kings Creek 25kV 25 0 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.