Costen substation interconnection queue
2 active projects totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Costen as the point of interconnection, all in MD.
Target commercial operation dates as filed run from Dec 2012 to Aug 2024 (3 filings).
2active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-084 | Costen Solar Energy Center | 25 | 3.8 | Solar | Withdrawn | Oct 2019 |
| AG1-360 | Costen Solar | 25 | 0 | Solar | In Service | Aug 2024 |
| X1-032 | Somerset Solar Project | 25 | 0 | Solar | In Service | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Somerset County, MD
- Loretto: 1 active, 50 MW of 4 filed
- Chestertown: 1 active, 19.8 MW of 3 filed
- Kings Creek: none active of 6 filed
- Crisfield: none active of 4 filed
- North Salisbury: none active of 3 filed
- Kings Creek-Crisfield: none active of 2 filed