Livingston, IL interconnection queue
15 active projects totalling 1,635.9 MW in the PJM queue, plus 32 with terminal status (shown greyed).
15active projects
1,635.9active MW
47total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-416 | Pontiac Midpoint 345 | n/r | 450 | Battery | Withdrawn |
| C01-1770 | Dresden - Mulberry 345 kV | 345 | 432.9 | Solar | Active |
| AH1-755 | Not reported | n/r | 330 | Hybrid | Withdrawn |
| AH2-415 | Pontiac Midpoint 345 kV | 345 | 300 | Battery | Withdrawn |
| C01-2184 | Pontiac - Dresden 345 kV | 345 | 288.6 | Solar | Active |
| C01-1098 | Dresden - Ponitac Midpoint 345 kV | 345 | 185 | Hybrid | Active |
| AH1-633 | Powerton to Katydid 345 kV | 345 | 172.8 | Solar | Withdrawn |
| AH2-113 | Dresden – Pontiac Midpoint 345kV | 345 | 170 | Hybrid | Withdrawn |
| C01-2175 | Essex (AD1-100) - Loretto 345 kV | 345 | 160 | Wind | Withdrawn |
| C01-2189 | Pontiac - Dresden 345 kV | 345 | 150 | Battery | Active |
| AG1-321 | Dresden-Pontiac Midpoint 345 kV | 345 | 126.4 | Solar | Withdrawn |
| AD2-177 | Pontiac MidPoint 345 kV | 345 | 123 | Solar | Withdrawn |
| AI2-106 | Pontiac MidPoint-Brokaw 345kV | 345 | 106.4 | Solar | Withdrawn |
| R30 | Pleasant Ridge Wind Farm | 345 | 100 | Wind | Withdrawn |
| AI2-100 | Powerton - Dresden 345kv (CIR Increase) | 345 | 96 | Wind | Withdrawn |
| C01-1422 | Katydid Road 345 kV | 345 | 96 | Wind | Active |
| AE1-252 | Loretto-Wilton Center | n/r | 90 | Solar | Withdrawn |
| AE1-205 | Blooming Grove Solar Energy Center | 345 | 84 | Solar | Engineering and Procurement |
| AI2-134 | Pontiac Midpoint 345 kV (CIR Increase) | 345 | 84 | Solar | Withdrawn |
| AE1-184 | Pontiac Midpoint-Dresden | n/r | 82.7 | Not reported | Withdrawn |
| C01-1704 | Powerton - Goodings Grove 345 kV | 345 | 80 | Wind | Active |
| T105 | Pontiac Midpoint-Wilton Center 350 MW | n/r | 70 | Wind | Withdrawn |
| R78 | Dresden-Pontiac 345kV | 345 | 60.1 | Wind | Withdrawn |
| R79 | Tazewell-Kendall 345kV | 345 | 60.1 | Wind | Withdrawn |
| AG2-114 | Dresden-Pontiac Midpoint 345 kV | 345 | 60 | Solar | Active |
| AH1-199 | Loretto 345 kV | 345 | 60 | Solar | Withdrawn |
| O22 | Top Crop Generating Facility | 345 | 60 | Wind | In Service |
| O23 | Top Crop Wind Farm | 345 | 60 | Wind | Withdrawn |
| O24 | Bright Stalk WF | 345 | 60 | Wind | Withdrawn |
| O27 | Powerton-Goodings Grove 345kV | 345 | 60 | Gas | Withdrawn |
| O51 | Cayuga Ridge South WF | 345 | 60 | Wind | In Service |
| W2-046 | Powerton-Goodings Grove 345kV | 345 | 58.5 | Wind | Withdrawn |
| AB1-024 | Loretto-Wilton Ctr | n/r | 50 | Not reported | Withdrawn |
| AI2-099 | Powerton-Goodings Grove 345kV (CIR Increase) | 345 | 49.3 | Wind | Withdrawn |
| C01-1423 | Katydid Road 345 kV | 345 | 49.1 | Wind | Active |
| L13_CE27 | Heartland Wind Livingston | n/r | 45 | Wind | Withdrawn |
| AE1-172 | Livingston Wind | n/r | 44.9 | Wind | Withdrawn |
| C01-1705 | Powerton - Goodings Grove 345 kV | 345 | 40 | Wind | Withdrawn |
| AB1-029 | Loretto-Pontiac | n/r | 35 | Not reported | Withdrawn |
| AH1-543 | Mulberry - Tazewell 345 kV | 345 | 31.5 | Hybrid | Active |
| Z2-087 | Bright Stalk Generating Facility | 345 | 26 | Wind | In Service |
| AA1-018 | Otter Creek Wind Farm | n/r | 19.5 | Wind | In Service |
| Z2-081 | Livingston Landfill Gas to Energy Facility | 34.5 | 13.3 | Gas | In Service |
| AG2-147 | Pontiac Midpoint 34.5kV | 34.5 | 12 | Solar | Withdrawn |
| AC2-152 | Pontiac Midpoint | n/r | 3.8 | Solar | Withdrawn |
| X2-092 | Cornell 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
| X2-093 | Pontiac-Midpoint 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.